Welcome to Doom9's Forum, THE in-place to be for everyone interested in DVD conversion. Before you start posting please read the forum rules. By posting to this forum you agree to abide by the rules. |
![]() |
#1 | Link |
Registered User
Join Date: Sep 2013
Posts: 38
|
Complexity calculating of Rate Control
In x264 Rate Control methods, it will do a half-resolultion motion estimation to calculate the SATD as the complexity. And I want to transplant the RC methods except the ME part. So I am confused with the complexity calculating part.
Could anyone give me some advice to get the complexity of the current frame without too much time? At first, I get a method to use the previous frame SATD as the complexity of current frame. But how can I determine the complexity of the first frame? Also, for some sequences, the SATDs between the contiguous frames have too much difference. How to sovle this problem? Thanks. |
![]() |
![]() |
![]() |
Tags |
rate control, x264 |
Thread Tools | Search this Thread |
Display Modes | |
|
|