foxmid
7th July 2004, 15:37
Hi there,
I'm working on the R1 version of Traffic, and for one PGC, there are 40 chapters for a total duration of 01:09. This is just a slideshow, should be no problem, right?
Of COURSE, I can't get the ReAuthorist generated script to work correctly.. So, last night I edited the scene times in the script file to match the IFO exactly. Re-imported, and since the clip isn't 16 seconds long like the IFO, I've got the same problem for about 37 scenes being too short.
How can I get Scenarist to import this particular asset as a slideshow? It's an m2v, so I'm assuming I can't..
I figured my workaround is to find something to split this M2V file into 40 separate still images, and rebuild manually. I don't know what the tool is for this job, however.
Anyone have any advice? Thanks for your help...
I'm working on the R1 version of Traffic, and for one PGC, there are 40 chapters for a total duration of 01:09. This is just a slideshow, should be no problem, right?
Of COURSE, I can't get the ReAuthorist generated script to work correctly.. So, last night I edited the scene times in the script file to match the IFO exactly. Re-imported, and since the clip isn't 16 seconds long like the IFO, I've got the same problem for about 37 scenes being too short.
How can I get Scenarist to import this particular asset as a slideshow? It's an m2v, so I'm assuming I can't..
I figured my workaround is to find something to split this M2V file into 40 separate still images, and rebuild manually. I don't know what the tool is for this job, however.
Anyone have any advice? Thanks for your help...