resonator79
10th May 2015, 12:43
Hi!
I was trying to see if I could learn something, but I can't figure it out so -
I "BDReauthor"-ed a BluRay where the main feature is a 29,97 stream, norm-converted from 25fps. I want to replace the clip - or playlist rather - with a new one that's based on a 1080i25 based file. I encoded all the assets, and I rebuilt a playlist that looks exactly the same as the "old" one. Now, how can I integrate this playlist into the old structure/scenario? Any ideas?
I was trying to see if I could learn something, but I can't figure it out so -
I "BDReauthor"-ed a BluRay where the main feature is a 29,97 stream, norm-converted from 25fps. I want to replace the clip - or playlist rather - with a new one that's based on a 1080i25 based file. I encoded all the assets, and I rebuilt a playlist that looks exactly the same as the "old" one. Now, how can I integrate this playlist into the old structure/scenario? Any ideas?