mtobc
4th April 2009, 04:32
Would the author consider expanding the -PREVIEW CLI Parameter to accept a given number of frames, or a switch to preview the entire input file(s)? This would give the most complete calculation of overall Video Type percentage, and perhaps more importantly all the bitrate numbers.
The reason I ask, I was thinking I could write a batch script to automate my DVD backup process. I could use the logs generated by calling DGIndex's Preview to set the most accurate values in the different tools I use. Sure it would add some time if the entire input was previewed, however with the Playback Speed set to Maximum and a fast computer, it's really not that lengthy.
What think?
The reason I ask, I was thinking I could write a batch script to automate my DVD backup process. I could use the logs generated by calling DGIndex's Preview to set the most accurate values in the different tools I use. Sure it would add some time if the entire input was previewed, however with the Playback Speed set to Maximum and a fast computer, it's really not that lengthy.
What think?