slam_to
27th October 2007, 06:21
Hi,
I was wondering how to generate the first pass information correctly if I'm planning on doing an inverse 3:2 pulldown on the material (ie. my final video will be a 23.98fps from source 29.97 material)
Should I run the first pass doing an IVTC, or should I be doing the first pass under the original frame rate?
(I'm using VirtualDub).
Help is appreacted.
Thanks,
SLam
I was wondering how to generate the first pass information correctly if I'm planning on doing an inverse 3:2 pulldown on the material (ie. my final video will be a 23.98fps from source 29.97 material)
Should I run the first pass doing an IVTC, or should I be doing the first pass under the original frame rate?
(I'm using VirtualDub).
Help is appreacted.
Thanks,
SLam