Hum, maybe it's another thing 2COOL has encountered. He doesn't say if the playback jumps from PGC 1 to PGC 2 by means of a NextPGC link, or if it jumps directly to the next PGC in the list because there are no post-commands nor NextPGC link. I don't know if it's something possible, but I'll test this scenario.
If there is a NextPGC link in PGC 1 pointing to PGC 2, my method will work: a new LinkPGCN to PGC 2 command will be added after the pre-commands of PGC 1, therefore the playback will be bypassed, and the pre-commands of PGC 2 will be executed normally.
|