PDA

View Full Version : Mid-phase resuming not possible in batch mode?


kumi
31st August 2007, 23:33
I've noticed that if I cancel a DVDRB project during Phase II and restart it, it will prompt to resume from the last successful .m2v encoded segment. If I load the same project as a batch job, resuming it will start Phase II from scratch.

Is there any way to cancel a batch job and resume it without losing the Phase II .m2v files encoded up to that point?

SpazzHH
1st September 2007, 03:01
Only way to do it is to resume the project in 3-click mode.

kumi
1st September 2007, 03:03
That's what I was afraid of: thanks for confirming it.

jdobbs
1st September 2007, 14:49
Make sure you remember to load the project first before attempting to resum... that way everthing will be set and pointed correctly. The batch mode loads a project during execution -- but it saves your original settings and restores them when it exits.