kumi
31st August 2007, 23:33
I've noticed that if I cancel a DVDRB project during Phase II and restart it, it will prompt to resume from the last successful .m2v encoded segment. If I load the same project as a batch job, resuming it will start Phase II from scratch.
Is there any way to cancel a batch job and resume it without losing the Phase II .m2v files encoded up to that point?
Is there any way to cancel a batch job and resume it without losing the Phase II .m2v files encoded up to that point?